Weeks | Topics |
1 |
Giving general information about the course process and model making. Explaining what the project assignments are. (11 product designs and 6 model making)
|
2 |
1. The project, the computer desk design, was designed in 2D or hand-drawn form and added to the live course homework management section.
|
3 |
1. Checking the project designs, starting 1/5 scale models, and 2. designing the project work, the library designs, in 2D or hand-drawn form and adding them to the live course homework management section.
|
4 |
2. Examining the project designs, 1st receiving the models, and the 3rd project, the coffee table design, being drawn in 3D CAD programs and uploaded to the live lesson system.
|
5 |
3. Examining the project coffee table designs, 2. Selection of models and starting their construction. 4. Project dining table designs are drawn in 3D CAD program and added to the live course homework management section.
|
6 |
Control of the 4th project, the dining table designs, delivery of the 2nd project, the chair designs, and the 5th project, the chair designs, were drawn in the 3D CAD program and added to the live course homework management section.
|
7 |
Control of the chair designs, which is the 5th project, selection of models, the selection of the third project, and drawing of the wardrobe designs, which is the 6th project, in the 3D CAD program and adding them to the live course homework management section.
|
8 |
Control of the 6th project, the dresser designs, delivery of the 3rd project, and the 7th project, the bed furniture designs, were drawn in the 3D CAD program and added to the live course homework management section.
|
9 |
The 7th project, the control of the bed designs, the 4th project, the selection of the models, and the 8th project, the wardrobe designs, were drawn in the 3D CAD program and added to the live course homework management section.
|
10 |
The 8th project, the control of the wardrobe designs, the 4th project, the delivery of the models, and the 9th project, the TV unit designs, were drawn in the 3D CAD program and added to the live course homework management section.
|
11 |
Control of the TV unit designs, which is the 9th project, selection of models, the 5th, and armchair designs, which is the 10th project, are drawn in the 3D CAD program and added to the live course homework management section.
|
12 |
The 10th project, the control of the armchair designs, the 5th project, the delivery of the models, and the 11th project, the product designs for the elderly or disabled, were drawn in the 3D CAD program and added to the live course homework management section.
|
13 |
The 11th project is the control of product designs for the elderly or disabled, the 6th is the selection of models, and the 12th assignment is the construction designs of the previous 11 designs, drawn in a 3D CAD program and added to the live course homework management section.
|
14 |
Checking the construction designs of the previous 11 designs, which is the 12th assignment, delivering the 6th models, and adding the renderings and videos of the previous 11 projects to the 3D CAD program and adding them to the live course assignment management section.
|