Print

COURSE INFORMATION
Course CodeCourse TitleL+P HourSemesterECTS
ITKS 107YARN TECHNOLOGY4 + 01st Semester4,5

COURSE DESCRIPTION
Course Level Associate's Degree
Course Type Compulsory
Course Objective TO TEACHING PRODUCTION PROCESS OF YARN.
Course Content Blend sample preparation, make opening and cleaning Tape to obtain the sample comb The sample tape to get traction To obtain the sample wick To obtain the sample ring yarn Open-End yarn sample to obtain To obtain the sample coil
Prerequisites No the prerequisite of lesson.
Corequisite No the corequisite of lesson.

COURSE LEARNING OUTCOMES
1The importance of textile industry of Turkey and the world..
2Important fiber properties of cotton and wool fibers.
3Spinning the basic calculations.
4Yarn numbering systems.
5classification of yarns.
6Shooting, dubbing and twisting operations.
7Cotton yarn production systems and machines.
8Blowroom machines, carding machines, draw frame machines
9Combing machines, ring spinning machines and roving machines.
10Rotor spinning machine.
11Wool yarn production systems and machines.
12Yarn production plans.
13New spinning systems.

COURSE'S CONTRIBUTION TO PROGRAM
PO 01PO 02PO 03PO 04PO 05PO 06PO 07PO 08PO 09PO 10PO 11PO 12PO 13PO 14
LO 001              
LO 002              
LO 003              
LO 004              
LO 005              
LO 006              
LO 007              
LO 008              
LO 009              
LO 010              
LO 011              
LO 012              
LO 013              
Sub Total              
Contribution00000000000000

ECTS ALLOCATED BASED ON STUDENT WORKLOAD BY THE COURSE DESCRIPTION
ActivitiesQuantityDuration (Hour)Total Work Load (Hour)
Course Duration (14 weeks/theoric+practical)14456
Mid-terms12828
Final examination13333
Total Work Load

ECTS Credit of the Course






117

4,5
COURSE DETAILS
 Select Year   


 Course TermNoInstructors
Details 2025-2026 Fall1GONCA ŞİMŞEK GÜNDÜZ


Print

Course Details
Course Code Course Title L+P Hour Course Code Language Of Instruction Course Semester Mode of Delivery
ITKS 107 YARN TECHNOLOGY 4 + 0 1 Turkish 2025-2026 Fall Face to Face
Course Coordinator  E-Mail  Phone Number  Course Location Attendance
Assoc. Prof. Dr. GONCA ŞİMŞEK GÜNDÜZ gsimsek@pau.edu.tr DTMYO B0107-01 %70
Goals TO TEACHING PRODUCTION PROCESS OF YARN.
Content Blend sample preparation, make opening and cleaning Tape to obtain the sample comb The sample tape to get traction To obtain the sample wick To obtain the sample ring yarn Open-End yarn sample to obtain To obtain the sample coil
Topics
WeeksTopics
1 Situation and important of textile at Turkey and world.
2 Important fiber characteristics of cotton and wool fibres.
3 Basıc computituon related spinning.
4 Yarn numbering systems.
5 Classification of yarns
6 Draft, doubling and twist processes
7 Cotton yarn spinning systems and machines
8 Blow room machinery, carding machines and drawing machines.
9 Indermatiate examination
10 Combed spinning machines, roving frame and ring spinning machines.
11 Open end machine.
12 Wool yarn spinning systems and machines.
13 Making the yarn production plan.
14 New spinning systems.
Materials
Materials are not specified.
Resources
ResourcesResources Language
PAMUK İPLİKÇİLİĞİTürkçe
Course Assessment
Assesment MethodsPercentage (%)Assesment Methods Title
Final Exam50Final Exam
Midterm Exam50Midterm Exam
L+P: Lecture and Practice
PQ: Program Learning Outcomes
LO: Course Learning Outcomes